Deep retrofits and home improvements.

A deep retrofit or uprgade is one that goes beyond just the surface of the issue. Rather than attacking the most obvious culprit, this approach goes deeper, ensuring entirely better building performance. Good building performance upgrades should improve all aspects of a building from a comfort, air quality and energy efficiency standpoint. The needs of every building are different which is why every component of the system must be evaluated throughout the process, starting with an energy audit or evaluation.

 

Keep in mind often the best time for this approach is in conjunction with other repairs or improvements. For example, typically the best time to consider attic improvements such as air sealing, insulation or HVAC changes is at time of roof replacement. Making these repairs while the roof is off/under construction can be most cost effective time because ease of access. This opportunity often allows better access to otherwise inaccessible components of the building which may be causing issues in the "whole system." Other examples of when to consider tackling these issues is during renovations, additions, siding replacement, basement finishing or drywall replacement/repair.

 

What sets ECS apart from other businesses is our ability to facilitate these projects so they can happen smoothly at the same time, without one process holding up the other part of the project. Between our staff and partners we can provide virtually any construction service down to building an entirely new home. So when it comes time to replace your old roof, plan a new addition, renovate etc. we are a one-stop building performance and home improvement contractor. Forget trying to organize a bunch contractors on your own, call us to handle it all and ensure that your project will be completed in a reasonable time frame and maximize your building performance benefit.

 

Click here to see an example of one of our past projects where we were able to facilitate numerous upgrades and home improvments all at the same time. Total project time was 5 days and included work from 6 different trade specialties.

bottom of page